Colorado Medicaid Work Requirement Letter: What Each Notice Means and How to Respond
A letter from HCPF about the work requirement just arrived. Before you do anything, figure out which type of letter you received — because they carry very different urgency levels and deadlines. Colorado sends three distinct types of notices, and confusing them is one of the fastest ways to lose coverage unnecessarily.
The Three Types of Letters
1. Informational Notice (No Action Required)
Starting in September 2026, HCPF began mailing informational notices to expansion adults whose 6-month renewal dates fall in early 2027. These letters explain that the work requirement is coming, what it means, and how to prepare.
What it looks like: General language about the upcoming January 1, 2027 start date. No specific deadline. No request for documentation. No case number action items.
What to do: Read it. Understand what is coming. No immediate response is required. This is advance warning, not a compliance demand. Use the time to figure out whether you meet the requirement, qualify for an exemption, or need to start tracking hours.
2. Request for Information (RFI) — 30-Day Deadline
If HCPF's automated data checks (ex parte verification) cannot confirm your compliance or exemption status, the state mails a Request for Information approximately 60 days before your 6-month renewal. This is a formal request for you to prove you meet the requirement.
What it looks like: Specific language requesting that you submit documentation or self-attestation. A 30-day response period that begins when you receive the notice. Instructions for how to respond through PEAK, by mail, or at your county office.
What to do: Respond within 30 days. During 2027, complete Worksheet J to report your hours, income, or exemption status through PEAK, the Health First Colorado app, or paper forms at your county office. HCPF may ask for more information if it cannot confirm what you report. Keep the confirmation number.
What happens if you miss the deadline: HCPF moves to the next step — a formal Notice of Action announcing coverage termination.
3. Notice of Action (NOA) — Multiple Deadlines
The Notice of Action is the formal adverse decision. It tells you that HCPF intends to deny your application, terminate your coverage, or move you to a lower benefit category due to the work requirement.
What it looks like: Formal legal language citing 10 CCR 2505-10 § 8.100. A specific "Date of Action" — the date your coverage actually changes. Fair hearing and appeal information.
What to do:
Within 10 days of the Date of Action: If you are a current Health First Colorado member, make sure the Office of Administrative Courts receives your hearing request by then to continue coverage during the appeal. Contact OAC at (303) 866-2000 or [email protected].
Within 60 calendar days of the NOA date: File a hearing request if you believe the action is wrong. This is the outer limit for requesting a fair hearing.
Within 90 days of disenrollment (procedural terminations only): If your coverage ended because you missed the RFI deadline — not because HCPF reviewed your case and found you ineligible — submit the required documentation to your county office for reconsideration without a new application.
The Date Confusion Problem
Notices contain multiple dates, and mixing them up has real consequences:
- Notice date: When the letter was printed and mailed
- Date of action: When the coverage change takes effect
- 10-day deadline: Runs from the date of action, not the notice date, not from when you received the letter
- 60-day deadline: Runs from the NOA date
- 90-day reconsideration: Runs from the date of termination
The 10-day window is the one that catches people off guard. By the time you receive the letter, open it, and process what it says, several days may have already passed. Act on the day you read it.
When Letters and PEAK Do Not Match
Reddit posts from r/Medicaid describe a recurring problem: a letter says one thing, PEAK shows something different, and the mobile app contradicts both. PEAK's backend has known synchronization delays, and after a procedural closure, the portal sometimes locks renewal links without displaying the 90-day reconsideration workflow.
If your letter and your portal do not agree, trust the letter for deadlines and legal rights. Use the county office for submissions if the portal is locked. The in-person receipt is what matters for proving you responded on time.
Free Download
Get the Colorado Medicaid (Health First Colorado) Work Requirement Checklist
Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.
A Response Checklist
When any work-requirement letter arrives:
- Identify which type of notice it is — informational, RFI, or NOA
- Find every date on the letter and calculate your deadlines
- Determine whether you meet the requirement, qualify for an exemption, or need to submit documentation
- Submit through the fastest available channel (county office if PEAK is unresponsive)
- Keep every confirmation number, receipt, and copy of what you submitted
The Colorado Medicaid Work Requirement Guide includes a notice response timeline tracker that walks through each letter type and maps every deadline from receipt to resolution.
Get Your Free Colorado Medicaid (Health First Colorado) Work Requirement Checklist
Download the Colorado Medicaid (Health First Colorado) Work Requirement Checklist — a printable guide with checklists, scripts, and action plans you can start using today.